

YQ-SS01
Heavy-Duty Steel Structure Anti-Corrosion System
Request a Quote
MOQ: Trial order — contact us · Packing: 20 kg (two-component)
- Anti-rust and anti-corrosion with strong adhesion and salt-spray resistance
- supplied as a complete primer — intermediate coat — topcoat system
- system build-up written out per project environment
Factory steel structures, bridges, storage tanks and outdoor metal facilities
YQ-SS01
Specification
| Specification | ≥ 55% (topcoat) · ≥ 65% (zinc-rich primer) |
|---|---|
| Coverage | 6–8 m²/L per coat |
| Drying Time | Touch dry ≤ 2 h · Hard dry ≤ 24 h (25℃) |
| Dilution | Two-component: mix ratio per TDS, thinner 5–10% if required |
| VOC | Batch-measured value stated on the COA supplied with each shipment |
| Scrub resistance | Not applicable — salt-spray and adhesion apply instead |
| Shelf life | ≥ 12 months (sealed, 5–35°C) |
| Gloss | Semi-gloss |
| Lead time | 20–25 days production lead time, excluding freight |
| Standard | GB/T 30790.5 · GB/T 1771 · GB/T 9286 · HG/T 3668 (steel systems) | GB/T 22374-2018 (floor) | HG/T 3792 (fluorocarbon) |
| MOQ | Trial order — contact us |
| Packing | 20 kg (two-component) |
Figures are the values required or typical under the standards listed, for technical evaluation — not our own measured results. The COA of the batch you receive prevails before contract.
Industrial & Engineering Coatings
Packaging and logistics
Standard export packs
5 L · 20 L · 20 kg · 25 kg
Primer, intermediate and topcoat quoted as one system with the mixing ratio on each label
Container loading
A 20GP is weight-limited for water-based paint: roughly 800–820 pails, about 21–22 t. The measured figure goes on your packing list.
Private label
Your logo and label layout on our formulation. Artwork proof and print run are confirmed with the quotation.
Put your brand on the pail →FAQ
Questions buyers ask
Industrial & Engineering Coatings
Related
Get an industrial coating solution
Send the service environment, the substrate and the protection you need. You get the primer–intermediate–topcoat build-up, film thickness and pricing as one package.