

YQ-TR01
Sports Running Track Coating System
Request a Quote
MOQ: Trial order — contact us · Packing: Supplied as a complete matched system
- Good elasticity, anti-slip and wear-resistant
- anti-ageing with stable weathering performance
- supplied as a complete matched system
School sports grounds, stadiums and community fitness running tracks
YQ-TR01
Specification
| Gloss | Matt |
|---|---|
| Lead time | 20–25 days production lead time, excluding freight |
| MOQ | Trial order — contact us |
| Packing | Supplied as a complete matched system |
Values shown are typical reference figures for this product type per applicable national/industry standards — not our own measured test figures. The test report of the exact batch/model prevails before contract.
Industrial & Engineering Coatings
Packaging and logistics
Standard export packs
5 L · 20 L · 20 kg · 25 kg
Primer, intermediate and topcoat quoted as one system with the mixing ratio on each label
Container loading
A 20GP is weight-limited for water-based paint: roughly 800–820 pails, about 21–22 t. The measured figure goes on your packing list.
Private label
Your logo and label layout on our formulation. Artwork proof and print run are confirmed with the quotation.
Put your brand on the pail →FAQ
Questions buyers ask
Industrial & Engineering Coatings
Related
Get an industrial coating solution
Send the service environment, the substrate and the protection you need. You get the primer–intermediate–topcoat build-up, film thickness and pricing as one package.